Rebuild Trailer page 14
All work, text, and photographs courtesy of Bob Hanover
Rebuild Project - 1981 Citation 25' Travel Trailer

Bathroom: Vanity is done, sink and plumbing all done. Just have to pull the toilet flange and dope the threads.

Bathroom vanity: Another shot to show the plumbing better.

Bathtub: Tub is secured in place. I'm not going to cover and finish it until I do a water test. Can't do that until all hot water tank is in. Can't do that until the siding is on. Can't do that until etc.

Bathroom ceiling: Shot straight up from the floor. Plywood covers the vent hole from the roof side.

Bathroom door area: Can't get back far enough for a decent picture - still have to build the door and mount it here to a ceiling hanger system.

Bathroom: As seen from the outside of the doorway looking in.

Bedroom: Base off the bed to expose the fresh water tank.

Plumbing and fresh water: All the lines are in place and the water pump. The fresh water tank is going to be replaced later with a larger one. This ones too small.

Finished bed: Well, if I get into the doghouse, I have a place to sleep now. Where's that foamy........?

Midship shot: It's taking shape - finally starting to look like something other than an abandoned shed!

Ceiling: As viewed over the bedroom area. Note the speakers in the ceiling. I put my driver bit right through the one on the right. Grrrr! A brand new speaker - never even uttered a sound before I wrecked it.

More ceiling: Taken from the bathroom door towards the front.

More finished ceiling: Over the kitchen area. First hole is a vent, far one is A/C. All the ceiling needs to be completely finished is the batons over the joints. That's slated for "Final Finish".

Front ceiling: Forward speakers and bottom of upper bunk. I know the light is crooked - its not screwed down yet. I want to replace them all.
Click to go to main page of RV Trailer Repair or continue to Rebuild Trailer page 15
|