Repair Trailer Roof page 11
All work, text, and photographs courtesy of Bob Hanover
Rebuild Project - 1981 Citation 25' Travel Trailer

New Rafters: The rafters start out as a pile of 2X6.

Rafter layout: Then I mark out the desired shape.

New rafters cut: There is the new design - all cut and ready to install.

Before shot: Time to open it back up and replace the framing.

Out with the old: Old framing just before removal.

Ventilation: How's that for a large roof vent. Eat your heart out Fantastic Fan and Maxx-Air!

Partly replaced: Some of the new rafters are sitting in place.

Front view: The whole back is in place - just a few more to go,

Front: Close up of the front. (That's my daughter standing in there)

New roof framed: That was a good days work! All framed up & ready for ceiling panels.

Roof framing: Another shot - Note the slope from the 1X3 runners down to the edge.

Roof framing: Closer view of the new rafters.

Roof framing: Low down shot to see the pitch of the roof better.

Fridge vent: Have to remember to seal this up good inside.

A/C opening: This ought to hold up the A/C without deflection!

Inside view: There's that big open ventilation system again. Hope it never rains in again!
Click for main page of RV Trailer Repair or continue to Repair Trailer Roof page 12
|